Tag Archives: Featured Project

Featured Project

Belmont Estates
Through innovative wetland mitigation we got 9 beautiful homes valued at 800k each on a previously unbuildable property because of wetlands and buffers
Grading Plan
Prepared and implemented a grading plan to create wetlands
Excavation & Grading
Successfully excavated soils to achieve wetland hydrology
Innovative and Cost Effective
Used excavated soils in landscape to limit hauling and dumping fees
Successfull Wetland Hydrology
Hydrological analysis successfully estimates grading to achieve wetland hydrology
Successful Planting Plan
A variety of native plant species are installed in wetlands and buffers appropriate for planting success
Installing Plants
Successful plant installation allows for a greater planting success and cost savings
Installed Plants
Plants are installed at optimal spacing and density for a greater planting success
Planting Success
Installed trees, shrubs, herbaceous vegetation, and willow cuttings to optimally maximize growth potential
A Job Well Done
Monitoring and Maintenance
A plan has been prepared to monitor and maintain created wetlands and their buffers
Irrigation and Ongoing Maintenance
Irrigation and weed management will ensure maximum planting success, which will in turn provides cost savings